Kelso 10ml Water Reservoir And Water Supply Upgrade (2)

In 2017 Eodo completed the construction of a 10ML post-tensioned concrete water supply reservoir and associated distribution water mains at Kelso, to cater for the predicted population growth of Bathurst.

Bathurst Regional Council appointed Eodo as principal contractor for the project.

The project involved:

  • The design and Construction of a 33m diameter, 12.7m high post-tensioned concrete water reservoir, the post-tensioned concrete base and foundation for the floor of the reservoir was one of the largest continuous concrete pours undertaken in Bathurst.
  • The reservoir walls comprised 36 pre-cast and post-tensioned concrete panels, which were fabricated by Eodo
  • The installation of approx. 7.1 kilometres of new water distribution mains
  • Design and Construction of a new transfer water pumping station

Contact Us

Share This

Select your desired option below to share a direct link to this page

Share on facebook
Share on twitter
Share on linkedin
Share on skype
Share on pinterest
Share on email